Industry

Firmware, converter design and product validation for industry

I take a product problem from the bench to a tested, documented result. Industry work is routed through NMIT where required.

Case study

Solar charge controller firmware for Aviva Smart Solutions

Client
Aviva Smart Solutions Pvt. Ltd., Bengaluru
Role
Principal Consultant
Period
May–October 2026
Product
Solar buck charge controller

The problem

The existing charge controller tripped on high current, and its original firmware was not available. The company needed MPPT firmware that limits charging current to the battery's setting, whatever the size of the PV array.

What I did

  • Identified the board's sensing, PWM, relay and display behaviour by testing
  • Diagnosed the earlier firmware's high-current trips
  • Developed MPPT with load curtailment and a battery-charging algorithm, in controlled, documented steps
  • Ran structured bench tests on a programmable PV array simulator

Delivered

A test report and a firmware build for field evaluation.

“We appreciate your technical depth, methodical approach, and prompt responsiveness throughout the engagement.”

Mr. K. Rama Mohan
Managing Director, Aviva Smart Solutions Pvt. Ltd.

Services

How I can help your team

Firmware development and validation

MPPT, battery charging, protections and control loops for microcontroller and DSP boards, tested on the bench before field use.

Converter design and testing

DC-DC converter design, magnetics and layout review, efficiency and waveform measurement.

Product validation

Structured bench tests with PV and battery simulators, documented results and clear pass/fail criteria.

Lab set-up advice for institutes

Choosing equipment, benches and kits for power electronics and embedded labs.

Corporate training

Hands-on training for engineering teams, built on the same Build · Measure · Explain method.

How an engagement works

From problem to tested result

  1. You describe the product and the problem

    What the board does, what fails or what is needed, and the hardware available.

  2. I propose the scope

    Tests, deliverables and timeline, agreed before work starts.

  3. Work is carried out and documented

    Changes in controlled steps, each one tested on the bench.

  4. You receive the results

    Firmware build, test report and measured data.

Facilities

  • SiC and GaN converter benches
  • FPGA real-time control and dSPACE
  • Battery and PV simulation
  • Power analysis on the oscilloscope

See the Hardware Lab →

Start a conversation

Describe your product and what you need. I'll reply with a proposed scope.

Send an industry enquiry

Planning an FDP or workshop?

Share your institution, topic, dates and audience. I'll reply shortly with a programme outline and kit details.

Send an enquiry →